Skip to content
StormTac
  • About us
    • About us
    • Meet our Team
    • Careers
  • News
    • News
    • Ongoing development
  • Publications
  • Services
  • StormTac Web
    • Areas of application
    • Method description
    • Pricing & purchase
    • StormTac Web Login
    • System status
  • Contact
Site Search

Release notes v18.3.1

  • 17 July, 20188 September, 2021

Max water velocity through ponds and wetlands. Calculation of the cross-sectional area at maximum water depth in ponds and wetlands, as well as the maximum water velocity flowing through this cross-section, compared to velocities at risk of erosion. These data are reported in Result report 4.2.

The Table Stormwater concentration (ug/l) per land use in Result Report 3.1 has been updated and does not any longer show overall standard concentrations per land use, but now calculated concentrations per land use based on specified factors for traffic intensities and density factors that increase / decrease the land use specific concentrations depending on input site-specific properties. These are those used in the pollutant calculations, as was the case earlier, but these were not previously reported per land use. If no such factors are specified in the Stormwater box, the table shows the same data as before, i.e. general standard concentrations.

Revised calculation of the total volume of underground macadam basins, where the previous parameter of design rain depth, which included the share of pores in macadam, is now replaced by a lower rain depth with a separate indication of the share of pores as input in the basin box. This gives a clearer and more accurate calculation of the total volume of the basin, which, however, becomes the same as before at a share of pore of 0.33 (default value in the box). The equation presented at the value in the flowchart has also been revised to contain this input share of pores (porosity for macadam).

Revised equations for baseflow and runoff presented in the flowchart, now presenting flow in l/s and concentration in ug/l.

Updates StormTac Web
Updated land use specific standard concentrations, including new functions of traffic intensities versus pollutant concentrations for roads. Updated reduction efficiencies.

Recent Posts

  • News in the Recipient-model 13 November, 2025
  • Calculation of reduced available volumes for flow detention in ditches and swales, taking into account the longitudinal slope 23 June, 2025
  • Dimensioning and calculation of flood volumes and increased flows at a longer (secondary) return time 2 June, 2025
  • Updated method for calculating acceptable pollutant load to the recipient 22 April, 2025
  • May 6, Requirements for Stormwater effluent concentration criteria with regard to EQS – webinar 3 April, 2025
  • Export with consideration of upstream flow detention – new automation with improved functions 15 January, 2025

Archives

  • November 2025 1
  • June 2025 2
  • April 2025 2
  • January 2025 1
  • September 2024 1
  • August 2024 1
  • March 2024 1
  • January 2024 1
  • September 2023 2
  • June 2023 1
  • November 2022 1
  • July 2022 1
  • June 2022 2
  • April 2022 2
  • March 2022 3
  • January 2022 1
  • December 2021 1
  • November 2021 1
  • October 2021 1
  • July 2021 2
  • May 2021 1
  • February 2021 1
  • December 2020 1
  • November 2020 3
  • July 2020 1
  • May 2020 2
  • March 2020 2
  • February 2020 4
  • January 2020 1
  • December 2019 3
  • November 2019 2
  • October 2019 2
  • September 2019 2
  • August 2019 1
  • June 2019 1
  • May 2019 2
  • April 2019 3
  • March 2019 3
  • February 2019 3
  • November 2018 1
  • October 2018 1
  • September 2018 1
  • August 2018 1
  • July 2018 3
  • May 2018 2
  • April 2018 2
  • March 2018 1
  • February 2018 3
  • January 2018 3
  • November 2017 6
  • October 2017 2
  • September 2017 2
  • August 2017 1
  • July 2017 3
  • June 2017 4
  • May 2017 1
  • April 2017 1
  • March 2017 3
  • February 2017 1
  • December 2016 1
  • November 2016 2
  • October 2016 3
  • September 2016 2
  • August 2016 2
  • July 2016 2
  • June 2016 3
  • May 2016 3
  • April 2016 2
  • March 2016 5
  • January 2016 3
  • December 2015 4
  • November 2015 1
  • September 2015 1
  • August 2015 1
  • July 2015 1
  • March 2015 1
  • February 2015 6

Meet Our Team

StormTac Team & contact information
  • LinkedIn
recipient stormwater model dimensionering dagvatten

Support

support@stormtac.com

Contact

Main office
Närkesgatan 8
116 40  STOCKHOLM

Invoice address
Boo Strandväg 1J
132 36  SALTSJÖ-BOO

info@stormtac.com

Copyright 2025 StormTac AB - All Rights Reserved.
Theme by Colorlib Powered by WordPress