Updates StormTac Web
– New calculated cross-sectional velocity in transport ditches, with recommended max velocities (see Result report 2.2).
– Added a possibility to save different flow reduction factors (box Flow detention facility) in different areas, A1, A2, …
– Revised section of wet ponds & wetlands, in which the embankment is deleted but instead mowed to the guide as recommended solution for a facility with a forebay.
– Revised section of ditches and swales for designs with no raised bypass (parameter h8).