Skip to content
StormTac
  • About us
    • About us
    • Meet our Team
    • Careers
  • News
    • News
    • Ongoing development
  • Publications
  • Services
  • StormTac Web
    • Areas of application
    • Method description
    • Pricing & purchase
    • StormTac Web Login
    • System status
  • Contact
Site Search

Release notes v15.1.2

  • 16 February, 20158 September, 2021

– Reports:
3 result reports and a complete report of report 1-3 are added.
The reports are in PDF format and you now have the option to save them or print them out.
I the section “Quickstart project” in the far right of the project row theres a pdf icon that takes you to the reports.
The delete button is gone and can be found in “Projects” as usual.

– Web browser support:
We now have support for Internet Explorer 11 besides the design in the topmenu when in flowchart mode.
That part looks abit diffrent then other pages topmenu. The pages are still operational.
We will look in to this and fix it in a future release.
IE 9 is exited and wont work. We belive that this version is end of life and is slow compared to IE 11.
Our recommendations is to upgrade to IE 11.
We are still doing work on IE 10 but it has not been verified yet.
To think about is that when generating a PDF report there might appear a popup wich you need to approve.
“Run controll” or similar. This is due to security settings that your company migh have added to IE.

– Project naming:
Creating projects with specialcharacters are now working. You can use & – % etc in project naming.

-FAQ:
FAQ is not in place with questions that we got so far. We will update this from now on.

– News:
There is now a new section where you easier can take part of release notes and other news.

– Design:
Some adjustments have been made. Formfields has been made wider to cope with longer strings etc.

StormTac Web is here! (Release date 2015-02-15)
Baseflow concentration form (solved)

Recent Posts

  • News in the Recipient-model 13 November, 2025
  • Calculation of reduced available volumes for flow detention in ditches and swales, taking into account the longitudinal slope 23 June, 2025
  • Dimensioning and calculation of flood volumes and increased flows at a longer (secondary) return time 2 June, 2025
  • Updated method for calculating acceptable pollutant load to the recipient 22 April, 2025
  • May 6, Requirements for Stormwater effluent concentration criteria with regard to EQS – webinar 3 April, 2025
  • Export with consideration of upstream flow detention – new automation with improved functions 15 January, 2025

Archives

  • November 2025 1
  • June 2025 2
  • April 2025 2
  • January 2025 1
  • September 2024 1
  • August 2024 1
  • March 2024 1
  • January 2024 1
  • September 2023 2
  • June 2023 1
  • November 2022 1
  • July 2022 1
  • June 2022 2
  • April 2022 2
  • March 2022 3
  • January 2022 1
  • December 2021 1
  • November 2021 1
  • October 2021 1
  • July 2021 2
  • May 2021 1
  • February 2021 1
  • December 2020 1
  • November 2020 3
  • July 2020 1
  • May 2020 2
  • March 2020 2
  • February 2020 4
  • January 2020 1
  • December 2019 3
  • November 2019 2
  • October 2019 2
  • September 2019 2
  • August 2019 1
  • June 2019 1
  • May 2019 2
  • April 2019 3
  • March 2019 3
  • February 2019 3
  • November 2018 1
  • October 2018 1
  • September 2018 1
  • August 2018 1
  • July 2018 3
  • May 2018 2
  • April 2018 2
  • March 2018 1
  • February 2018 3
  • January 2018 3
  • November 2017 6
  • October 2017 2
  • September 2017 2
  • August 2017 1
  • July 2017 3
  • June 2017 4
  • May 2017 1
  • April 2017 1
  • March 2017 3
  • February 2017 1
  • December 2016 1
  • November 2016 2
  • October 2016 3
  • September 2016 2
  • August 2016 2
  • July 2016 2
  • June 2016 3
  • May 2016 3
  • April 2016 2
  • March 2016 5
  • January 2016 3
  • December 2015 4
  • November 2015 1
  • September 2015 1
  • August 2015 1
  • July 2015 1
  • March 2015 1
  • February 2015 6

Meet Our Team

StormTac Team & contact information
  • LinkedIn
recipient stormwater model dimensionering dagvatten

Support

support@stormtac.com

Contact

Main office
Närkesgatan 8
116 40  STOCKHOLM

Invoice address
Boo Strandväg 1J
132 36  SALTSJÖ-BOO

info@stormtac.com

Copyright 2025 StormTac AB - All Rights Reserved.
Theme by Colorlib Powered by WordPress