Minor updates StormTac Web
Choice between box Sewer and box Ditch & channel
Now you can choose between these boxes in the same way you choose a treatment facility.
You click on the box that you want to use for designing a transport facility, then click on the OK button and click on the box and enter the design input. The results report shows only the dimensioned type of facility, and the results of the second box are no longer displayed.
Default is the box Sewer selected, even when you open an old project.
Data in project notes
The user is recommended to include project-specific notes in the Project Notes box at the top left of the flowchart.
Examples of notes are default data that have been changed, such as a over-written standard concentration or any other input or assumptions made and which is wise to save for any future revisions in the project.
To show that there are notes, an icon will flash for a few seconds at the top left of the flow chart.
We have also made minor adjustments in the boxes Precipitation and Reduction efficiency.
Do not forget to press ctrl + f5 when you enter the flow chart if it looks strange with icons, etc.